[Trac Statistic : 2008.10.31]
regina
regina_kim at openmoko.com
Fri Oct 31 14:50:44 CET 2008
Hi everyone :-)
As usually here is Trac Statistic of Milestone Om2008.10
This week's changing is totally 2 closed,2 fixed, 2 new, changed 2
tickets testing status.
Please refer below the lists.
*Total : 48 Closed : 10 Active : 38 *
- Qtopia (18)
Opened : 13 Testing : 2 Fixed(closed) : 3 --- 1 fixed
- Installer (4)
Opened : 2 Testing : 1 Fixed(closed) : 1
- *Location* (5)
Opened : 1 Testing : 2 Fixed(closed) : 2 --- add 1 new
- E-illume (3)
Opened : 1 Testing : 1 Fixed(closed) : 1 --- 1 ticket changed to
testing status / add 1 new
- System software (10)
Opened : 9 Testing : 0 Fixed(closed) : 1 --- 1 fixed
- Setting (2)
Opened : 2 Testing : 0 Fixed(closed) : 0
- Distro (4)
Opened : 1 Testing : 2 Fixed(closed) : 1 --- 1 ticket changed to
testing status
- *Unknown* (2)
Opened : 0 Testing : 1 Fixed(closed) : 1
Trac : https://docs.openmoko.org/trac/milestone/Om2008.10
--
Best Regards,
Regina
Regina kim
software testing engineer
http://openmoko.com
Tel:+886.2.8751.5071 ext.2852
Email:regina_kim at openmoko.com
More information about the devel
mailing list