Neo Freerunner manufacturing status
"Marco Trevisan (Treviño)"
mail at 3v1n0.net
Wed Mar 19 09:24:00 CET 2008
Michael Shiloh ha scritto:
> Hi everyone,
>
> I just received a status report from our VP of Marketing, Steve Mosher:
>
>
> The Freerunner design is currently staged to go through Production
> Validation Test (PVT). The hardware design A5 is, we believe, solid. We
> are updating this design to A6 to maximize production yields.
The A6 specs/changes from previous version are only these [1] ?!
Just to know... Thanks!
[1] http://tinyurl.com/35j4gw
--